Showing posts with label Fogarty Creek Blazer. Show all posts
Showing posts with label Fogarty Creek Blazer. Show all posts

Tuesday, March 4, 2014

Introducing Blueberry

It would seem that the saga of the moose buttons should be over. Today they finally found their way to my mailbox. Unfortunately I didn't realize what a difference 1/8" would make. The pattern calls for 3/4" buttons. I figured the moose were 5/8" so it should be close enough. I think if they were 7/8" it would be fine, but I find myself questioning if they're too small for this sweater. Equally frustrating the flower buttons I ordered for Blueberry (more on that in a moment) are 3/4" and feel too bulky. It looks like the flowers might work for the green sweater and I have time to find something daintier for Blueberry. Really there's no deadline for the green sweater so I have time to think about whether I want to use the moose, the flowers, or search for something different. I had trouble getting decent pictures, but the one on the left gives you an idea of size and the picture on the right gives a close-up of the flower and moose buttons.


In happier news I've finally cast on Anne's Cardigan. I tend to give my sweaters working names (i.e. Purple Monster, Brown Blob, and Green Sweater.) Most of them get named when I shout something out in frustration. I've decided to start this sweater on a more positive note and so it's been named Blueberry. I always start out loving my projects and then get bored or run into problems. I remember how excited I was when I started the green sweater. I'd spend several months working on an oatmeal colored sweater with a basic cable. I loved the rich forest green and all of those fun cables. By the end the thing seemed dull and a bit fiddly. (Give me the right buttons, a good blocking, and a couple weeks and I'm sure I'll be in love again. It really is a beautiful sweater.) 

I'm ready for spring. I absolutely love this color (Knit Picks stroll tonal in Blue Yonder.) It reminds me of the warm blue that returns to the sky in the spring. The pattern is pretty easy so I'm hoping to finish Blueberry in time to wear her this spring. My workplace tends to over use the air conditioner so I'm sure this lightweight sweater will get lots of use. The one thing I see as a potential problem is the needle size. The pattern calls for US5, but after doing a swatch I needed US2 to get gauge. I decided to knit a sleeve as bigger test, and so far the size 2 needles are creating the right size sleeve. Normally I'm spot on with gauge so having to go down three needle sizes is nerve wracking. (I'm using the suggested yarn from the pattern and it looks like most of the ravelry people got gauge with the needles called for, but a common complaint is that the sweater is too big. Not really sure what's going on.)

I've also been working on my second orange sock. I took this with me to my quilt guild meeting last night and had so much fun with the meeting I forgot to pay attention to how long my sock was getting. I was so annoyed to get home and realize I'd knit half an inch more than I did for the first leg. At least it was a pretty fast frog and I'm back on track now.



Wednesday, February 26, 2014

Sweaters are Not Books

When I was little I would hit a point in a book where I knew I would be up until it was done. The Harry Potter books were the worst. I would usually hit that point with somewhere between 100 and 200 pages left. Those were some really late nights. Even now I find myself staying up late occasionally when I find a really good book. Unfortunately that is not the case with the green sweater. I'm trying to focus, but it's really hard. I think at least once a night my husband is reminding me that I need to knit. Currently I just need to cast off the back, knit the other back shoulder, and bind the shoulders together. Then of course I need to knit the collar and sew in the sleeves and collar, and sew on the buttons. 

The buttons have their own story going on. I posted a couple of weeks ago that I found these really cute moose buttons on Knit Picks website. Knit Picks was great and had everything shipped very quickly. Unfortunately I'm not sure it's a good idea to release moose into the wild and not expect them to wander. (For those not familiar with Knit Picks US shipping policy they ship using smart post. FedEx takes the package to the nearest post office and the post office takes it those last few blocks to my door.) The moose appeared to be following a logical course from the warehouse in Ohio to the post office in Boyden and there they sat. Our postal carrier doesn't seem to like Smart Post so it usually takes a few days before he decides to put it on the truck. It doesn't pay to complain because then it will just be longer that he holds your moose hostage so I did my best to be patient. A week later and there are still no moose buttons. Late last night my husband checked the tracking page and my moose have decided to go for another trip. For some reason they've gone from Boyden back to Kansas City. We have had some winter weather lately. (The Tuesday they supposedly arrived in Boyden we had a fairly bad snow storm.) My husband and I are wondering if something got scanned wrong and the moose have been wandering the country for the past week. I'm interested to hear the stories they have to tell when they finally arrive, but I've heard rumor that what happens in the box stays in the box. At least they were sent out with some flowers for the blue sweater so I know my moose won't get hungry.


Monday, February 24, 2014

What I've learned from the Green Sweater

As the end of the green sweater gets closer I find myself looking back at what I've learned. I've read lots of comments from people who've never tried anything complicated. If that's what you like that's great. I'm a firm believer that you should knit what you love. If however you've never tried anything complicated because you're scared or don't know where to start I want to share a few of the things I've learned from this sweater. One of the best things I read when I was learning to knit was that all knitting can be broken down to the knit and purl stitches. If you can do those two stitches you can knit anything.

I struggled a lot with reading charts when I first started this project. Check your pattern to make sure your designer isn't trying something wonky, but most knitting charts I've encountered are read right to left and bottom to top on the right side rows. When you're knitting in the round every round is a right side row. When knitting a piece flat, like the body of the green sweater, the wrong side rows are read left to right. I love the magnetic chart keeper I got from KnitPicks, but I found out that highlighters are really nice with complicated charts. I don't have to worry about my magnets getting moved, and by using different highlighters for each day of the week I can see how much progress I'm making. 

I've also really perfected the art of tinking. Several of the cables in this sweater have seed stitch in between.   It's not uncommon that I put a knit where a purl should be or vice versa when working the wrong side. I've gotten really good at using a crochet hook to drop down a single stitch and turn it into a knit or purl by pulling it through the front or back of the loop. (Insert the crochet hook into the front of the stitch for knits and into the back for purls.) I've also learned how to drop several stitches four or five rows to fix miscrossed cables. 

Take the stitches for the wrong section off of your needles. (I also find it's a good idea to move the stitches that are staying on your needles far back so you don't have more loose stitches than you want.) Pull out the stitches to the row below the mistake and place on a DPN. In the background you can see the chart keeper and highlighter trick that I was talking about.

Working with a second DPN, and possibly a cable needle, knit the stitches according to the pattern using the loose yarn from the rows that you've ripped. Make sure to keep your yarn tension steady as you work so that you have enough yarn to knit the last stitch, but don't have lots left over. (It does take some practice, but if you do it wrong rip it out and try again. It's just yarn.)

I like using DPNs when I'm doing this so that I can slide my stitches to the end of the needle and always knit on the right side of the fabric. Continue to knit the stitches that you're fixing following the pattern until you get back to the row you were on when you discovered the mistake. You can either slip the stitches back on the needle or just knit them off of the DPN. It's a little scary to see all those loops of thread hanging loose, but I prefer this method to the options of leaving the mistake or ripping out four or five rows.

Tuesday, February 11, 2014

Almost done

The green sweater is getting extremely close to being done. I've finished both fronts and just have the back and collar left. I even made a choice on buttons and should be getting them in the mail soon. I'm not sure where to find buttons on the KnitPicks website without doing a search, but when you do a product search there are 8 pages of buttons! I found some cute Scottish Thistle buttons but couldn't justify twenty dollars for buttons when there were 8 pages of options. I ended up going with the moose buttons. I think they'll look really good with the sweater.


I'm hoping I can get this sweater finished in the next week or so. Once it's done I have plans to cast on for Anne's Cardigan. I really want to alter the pattern and knit it as a single piece to the arms like I did on the green sweater. This would mean I wouldn't have to mess with any seams, but I'm not sure how to alter knitting patterns. Do I just knit across the charts and act like they're all combined, or do knitwear designers add a stitch or two at the edges to leave room for seams? These are probably crazy questions considering the sweater I'm just about to finish, but I've never altered knit patterns. Quilt patterns I see as loose suggestions of what to do, but knitting feels like I'm doomed to fail if I go off pattern. I know this is ridiculous and lots of knitters alter patterns all the time, but it still is very scary to contemplate. 

Sunday, February 9, 2014

Focusing on the Finish Line

Last week I was happily working along on the green sweater when I saw another blogger posting about the Ravellenic Games. Immediately I wanted to set greeny aside and cast on a new sweater with the lofty hopes of finishing it in two weeks. My husband knows me very well and knows that at the end of the two weeks I'd have another WIP and would be upset with myself for not meeting the impossible goal. He gently reminded me that I have several projects on the verge of being done and questioned if this really was the best time to start a new sweater. As usual he was right and inspired me to set my own goal. In the next two weeks I will focus on finishing everything that is close to being finished. It won't count towards any competitions, but it's still a good goal.

Writer's Block is still patiently waiting for binding. I also got two tops back from my quilter so now there are three quilts that need binding and labels.

In addition to finishing the green sweater I also need to finish the button band on the brown blob (I ordered more yarn when I ordered buttons for greeny.) I need to finish sewing the ribbon onto the steeked part of the purple monster and add buttons. (I also might need to find a solution to loosening the wrists. The color work on the cuffs have made it so that the sleeves aren't comfortable.) The last thing on the list of things to be finished are my fingerless gloves.


These aren't all of my WIPs. (You'll notice the mystery quilt is no where to be seen.) These are just the projects that are one or two steps away from being finished. Last summer my husband helped me wind up my yarn mountain. The light blue yarn in the mountain is going into the fingerless gloves, the yellow yarn became Omelet (I should probably add a photo shoot of Omelet to my list of things to do in the next two weeks.) The brown yarn became a hat I made for my husband for Christmas, which leave the blue yarn at the base of the mountain. When I finish with this list I get to cast the blue yarn on for Anne's Cardigan.



Wednesday, February 5, 2014

Green Sweater goes Pink

You might be wondering how the green sweater has gone pink. No I haven't dyed it. I got two of my Valentine's Day gifts early and I get to announce them today. I've been struggling to get the Pintrest image to hover over my pictures so linking can be easy. My husband figured out how to add that to the blog, and has added a thing that causes thumbnails of related posts to show up at the bottom of posts. (This one only works when you are in a specific post. If you're on the home page you have to click on the title of the post to see related posts.) After spending a half hour working on those things my husband commented that he felt he was getting off easy and asked if there was anything else I wanted. I suggested he could always get me a sheep.


This blog has been a great motivator this week. On Sunday I had 13 rows left until I reached the armscye. I got it into my head that if I really focused I could finish those rows before today's posting. Last night I had four rows left. I usually don't knit four rows on weeknights. I'm too tired to give the charts the focus they need, but nothing new was on t.v. We found some reruns of one of my favorite shows and I finished the last four rows in the chart! 


The next step involves knitting the left front, back, and right front as separate pieces. The pieces not being worked on get slipped to waste yarn. I always hate slipping things to waste yarn because it's such a hassle to put them back on the needles. When I woke up this morning I remembered that I'm using interchangeable needles. Rather than slipping the stitches not being worked on to waste yarn I can just move my needles to a new cable and leave the current cable in the stitches. Then when I'm ready to pick up those stitches I can put my needle back on the cable and I'm ready to knit the next set of stitches. (This method would also work with fixed circular needles by using a second circular needle.)

*Update: I keep forgetting to include the link to the pattern. Sorry about that. This sweater is KnitPicks Fogarty Creek Blazer. You can get the sweater as an individual pattern of part of the Rocky Shores book. I love all 6 patterns in the book and would recommend spending the extra money to get the book instead of the single pattern. I'll probably be making more items from the collection in the future.

Wednesday, January 29, 2014

Progress!!!

I finally feel like I'm making progress on this sweater. I'm 15 rows away from the armscye (which apparently is a fancy word for arm hole.) The colored high lighters are a really great motivator. I've set myself the goal of finishing at least one row a day this week. Monday and Tuesday it was only one row, but it's one more row than I had the day before. In March I'm going to an overnight quilt retreat and I'm hoping I might be able to wear this sweater in place of a coat. This might be a bit unrealistic since it assumes I can finish the never ending sweater in a month and that the weather will decide to warm up by March.

Nevertheless the end of this sweater seems to be in sight. I've even started looking for buttons. I want this sweater to be in my wardrobe for at least the next 10 years so I'm avoiding the owls. I think the moose might also be nixed, but beyond that I'm not quite sure. I think I'm going to try and find something with a Celtic design but after looking at KnitPick's site that narrows my search down to about 50 buttons. 


Wednesday, January 15, 2014

Highlighters and Sweaters

Today I decided to see just how long this sweater is. The two front sides and back are all knit as one piece up to the armscyces. There are days it feels like I'm not making any progress, but that might have something to do with the fact that my arthritis is still flaring. It's significantly better than last week. Sadly one of the few things that is causing it to act up right now is knitting. At least I can quilt without pain so I have several Mondays worth of posts that I can start sharing.


I have discovered multicolored highlighters are a great way to mark my completed rows. I think this might be a bit like saying I've discovered there's some fun stuff to do in Chicago, but it's something new to me so I'm claiming the discovery. With these long rows I lose track of how many rounds I've done in a day. Frequently because I can't see any progress I feel like I'm not accomplishing anything. By changing the color highlighter I'm using I can see that I finished three rows last night. Right now I just have four highlighters and am changing every day. I want to get a set of highlighters with 7 colors and assign one color to each day of the week. This will let me track my progress from week to week and see how many days during the week I'm not touching this sweater.

I think this might be one of my favorite shots of this sweater. I love how beautiful those cables look. My progress may not be as fast as I wish, but this photo reminds me that progress has definitely been made.


Wednesday, January 1, 2014

Out of Exile

I really need to learn not to put off the parts of projects that I dread the most. I finished all of the pieces for the brown blob at the beginning of December and only had the button band left. Hating button bands I worked on these yummy alpaca mitttens for my sister. 
Bella's Mittens Misti Alpaca in Chunky: camelback

For my mom I decided to make another Dragonfly Wings shawl. She's allergic to wool so I used Deborah Norville's Serenity Garden Yarn. It's 100% Dralon Microfiber (whatever that is.) I've read a lot of reviews about this yarn splitting, and I could see how that would be an issue, but I didn't really have any problems with it. I don't like it as much as some of the other yarns I use, but it is a nice option for when I can't use wool.


I was really happy with the stripes that the yarn made. It looks great with this shawl.


Dragonfly Wings Deborah Norville Serenity Garden: Hibiscus

Finally I couldn't put off the button band any long so on December 21 I finally did my seams and cast on the button band. (I should point out that I was celebrating Christmas with my family on December 23 so I had a mere 2 days to finish this sweater.) I knew I would be cutting it close with the amount of yarn I had left, but I was hopeful I could finish it. Unfortunately I ran out of yarn with 4 rounds left to go on my button band. I quickly ran to the store, but not surprisingly Wal-mart doesn't have a good selection of yarn. I tried running to Ben Franklin but they only had some nasty acrylic brown stuff that I didn't think would go well with the Knit Picks Wool of the Andes I'd used on the rest of the sweater. I thought about an IOU, but the yarn I need won't be available until the end of January. Some quick thinking and faster knitting and by the end of the night I had a hat.


I'll order more yarn the next time I place a KnitPicks order and will finish the brown blob for Christmas 2014. This brings me to the title of today's post. Last year after Christmas I cast on for the Fogarty Creek Blazer. I finished both sleeve and a few inches on the body of the sweater when I felt the urge to knit lace. I managed to resist the urge for a while, but as spring turned to summer the idea of knitting a heavy wool sweater became less and less desirable. Finally when I couldn't tolerate it any more the green sweater was banished to the stash box. Banished feels like a harsh term since the sweater didn't really do anything wrong, but since I've completed five projects, countless socks, and all but the button band on another sweater banishment is probably the right term. Lately our high has been hovering somewhere in the single digits with windchill pushing the temperature to -30 some days it's the perfect time to be working on a heavy wool sweater. I finished the back through waist chart and am making good progress on the charts leading up to the armscye. 




Wednesday, July 17, 2013

Knitting ADHD

This week I think my knitting brain has been struck with ADHD. Nothing I've touched has brought much satisfaction. I'm not sure if it's the heat or arthritis but I haven't been in the mood to do much cabling. I fought these feelings and have made some progress on the green sweater.



I like the fact that this sweater is knit as one piece with shaping added in. I think it will create a very tailored piece when it's finished and I love that I don't have to do any big seams. The thing I hate is that it's close to 300 stitches long so I only do one or two rows a day. Progress is very slow, but it continues to be made.

This weekend was extremely hot. I couldn't handle the thought of knitting the green sweater and having all of that yarn in my lap. I have a dirty little secret hiding in my knitting stash. A lone sock. (I know it's a shocking secret I'm sure no other knitters share.) I prefer using DPNs for socks, and usually I cast on the second sock immediately after finishing the first sock so second sock syndrome doesn't have a chance to strike. Since finishing this sock I've finished three pairs of socks and a shawl since finishing the first sock of this pair in January. Unfortunately I chose the wrong pattern for this yarn and refused to admit it until the end of the first sock. This sock continues to haunt me though so I cast on it's mate on Saturday. I'm not overly motivated to make hand knit socks in July and a sock I don't particularly love isn't going to draw my attention very often, but it's on my favorite needles for sock knitting so it will get done sooner or later.

Monday I finally found something to capture my knitting attention. Last week I shared pictures of my new Shimmer yarn. I've gotten it wound into a ball and have started knitting Omelet. I love this yarn and it works perfectly with my pattern. I've done a couple of projects with lace details, but nothing quite like this. I am in LOVE with this pattern and this yarn. My guess is that next week the green sweater and socks will have been neglected horribly as this shawl and I have a joyous knitting affair.


Wednesday, June 26, 2013

The Return of the Purple Monster

Last year I was working on a purple bohus sweater that I got as a kit from KnitPicks. After completing a few plain sweaters and one with cables I decided that if I wanted to be a real Knitter I needed to do colorwork. This sweater has taught me to choose projects I love rather than projects I feel like I should do. I've cursed this thing many many times. Finally after finishing the body of the sweater I shoved it in a bag, bought a new knitting bag, and started my green Fogarty Creek blazer. I am in love with the Fogarty Creek sweater, but it has been put on hold until fall.  I can't wait to wear it in the winter, but right now it's 90 degrees outside. Winter is a distant memory and I have a few months where I can live in the delusion that it will never return.


I finished the Dragonfly Wings shawl over the weekend. (I'm going to do a proper photo shoot with Dragonfly and post those pics on Saturday.) I really want to do some more lace and have even picked out the perfect yarn, but I don't like having too many projects on my needles at a time. No matter how much I try to have a complicated project for times I want something interesting and an easy project for times I want mindless knitting I always focus on one project and the other languishes in danger of becoming a UFO. The green sweater and I have worked out an agreement that it will get finished before I start on Christmas knitting (People who are currently slated to get sweaters may be reduced to vests or possibly socks.) The Purple Monster has haunted me like a bad dream and I can't reach any such agreement with it. All I have left is the sleeves (which have more of the stupid colorwork on the cuffs) and steek (this thing should be grateful for sleeves, but since it's got this weird band in the front that sets it up for steeking and the neck is too tight to fit over my head I have no choice but to face the scissors at the end.)

On the bright side the first sleeve is growing pretty quickly so maybe I can order my lace yarn. The promise of alpaca and silk may be the incentive I need to finally finish this sweater.


Wednesday, May 29, 2013

Picasso Socks 3

This long weekend was great for knitting. I finally finished the Picasso socks. I tend to be a slow distracted knitter, but on Saturday I successfully turned the heel and finished the foot! (I couldn't resist showing off my basil and African violet. I've tried for several years to raise an African violet, but this is the first time I've convinced one to re-flower after all of the blooms fell off.)

My green sweater is progressing at a much slower rate. I'm finally understanding why knitters have more than one project going at a time. The cables in this thing are rather intense and don't satisfy my craving for simple mindless knitting. 

Over the weekend I picked up Boyfriend Sweaters and I'm thinking I may be casting on one of those sweaters soon. They're simple enough for the end of a long day of work, and the yarn is big enough it's not going to hurt my fingers when my arthritis is acting up. The only problem is figuring out yarn substitutions. One of the sweaters I really love is knit with Baby Camel. I'm not sure what universe this guy lives in, but my husband would be horrified if I gave him a sweater that costs as much his wedding band. In the meantime I'm going to stroke my green sweater a bit more. I love that the cable pattern is finally starting to show.

Wednesday, May 8, 2013

Permission to Fail

Saturday I had the opportunity to meet with my knitting mentor, mom, and sister. Unfortunately our schedules don't line up very frequently so we're lucky to meet once every month or two. It was very comforting to see her eyes pop out when she saw the pattern I was trying to figure out. I'd started it the week before and things were beginning to click, but there were still problems. After talking through the pattern with her I found the few stitches that had gone missing, then I realized that I'd forgotten to work the increases every row like I was supposed to, discovered I'd been reading more of the chart than my size called for, and had forgotten to switch to larger needles when I switched to the charts. I try not to obsess over every mistake I make while knitting, but the mistakes had hit the crucial number where fudging would no longer work. I cast on knowing that I might have to frog, but that I would learn enough to be successful the second time. (I do wish that I had thought to thread a piece of dental floss through the last row of seed stitch so I could have avoided re-knitting the first seven rows of the pattern.)

As I was ripping back a week worth of knitting we started talking about the courage it takes to fail. It's difficult to start knowing that failure is a very real possibility. It's much easier to stick to the things you know can be done perfectly, but this stops you from growing. One of the things that has stuck with me is the thought of practicing doing things that open you up to failure. I love that knitting gives me a safe place to fail. Worst case scenario I wouldn't be able to salvage the yarn and would be out $2.69. For this sweater I spent a week knitting something that I ripped back. It would be easy to see that week as wasted time, but the mistakes I made have taught me how to do this sweater correctly. I'm discovering that as I fail in the safe things like knitting I have the courage to fail in other, less safe areas. It doesn't mean that when I fail, especially at the bigger things, it doesn't hurt, but I don't let that fear of hurt stop me from trying.

As proof that I learned from failing my first attempt at this sweater took me a week. I cast on for the second attempt Saturday and I'm almost done knitting the frogged yarn.


Wednesday, May 1, 2013

What kind of knitter are you?

I've heard several discussions about product vs. process knitters. I've always suspected that I fall into the product camp, but after this week there is no longer any doubt in my mind. I am a product knitter. I usually start looking for my next project shortly after casting on my current project. I think about what piece I want in my wardrobe, spend hours looking through patterns, and debating what yarn I want to use. Because I have a fairly solid vision of what the finished piece will look like I don't have too much trouble focusing on my project. I may have a sock or dishcloth floating around, but they only get attention when I'm too tired to work on the main knitting. If you've been here for a while you might be asking about the Purple Monster. This sweater was my attempt at being a process knitter and the knowledge that real Knitters do colorwork. I have the sleeves and steeking left on this sweater, but because I didn't follow my process of selecting a project I feel no guilt over it not being done. The price of the yarn will force me to finish it sooner or (probably) later, but this week has not been the purple monster's week.

I've been making steady progress on my Fogarty Creek Blazer, but have gotten stuck on how to read the charts for the main body. I think I've figured it out, but now I need to get the right number of stitches on my needles. I should have known that with 282 stitches some of them were bound to go missing. Since I haven't been able to work on my green sweater, and I can't spend the week not knitting I've been reluctantly working on a sock. My husband really loves this pair of socks so I've been trying to get them done. (Turns out I married a product spouse who sees a pair of socks in some yarn and a half finished sock.)

So are you a product or a process knitter?

Wednesday, April 24, 2013

Sleeve Update 5

This sweater is starting to reveal it's problems. The multiple charts for the back make absolutely no sense to me. In truth the problems are probably with the knitter and not the pattern, but let's just skip over that little detail. One of the ladies in my quilt guild is an experienced knitter so she'll be able to help me figure out how to do the back.

For today I'm going to focus on the positives. All of my quilts for the show are finished so this weekend I was able to focus all of my attention on knitting. The attention paid off because I was able to finish the second sleeve!


My husband pointed out last night that the sleeves may be a little larger since I was able to try them on over the sweater I was wearing. I'm planning on wearing this sweater as a top layer so I'm not that worried about it being big. Hopefully when I block it everything will work out.  


As I was taking these pictures my camera battery decided it was a good day to die. I apologize for the blurriness, but since my goal was to finish both sleeves by Ginny's Yarn Along this week I wanted to show off that I did indeed finish.


Wednesday, April 17, 2013

Sleeve Update 4

I can't believe this is my 50th post! I know in the world of blogging where people are celebrating their 200 or 300th post 50 isn't very big, but I have to reach 50 before 300. I'm almost finished with the binding on the last quilt for the show so next week I'm hoping this sleeve will be much further along. It's encouraging to look back at previous posts of this sleeve and see that it is indeed getting longer. It feels like it hasn't grown at all since last week, but when I reviewed last week's post I've realized I completed another repeat of the cable pattern.


I'm currently reading listening to When the Morning Comes, the second book in the Sister's of the Quilt series. It takes such a drastic turn from the first book in the Sister's of the Quilt trilogy that I really don't want to give anything away. All I can say is that it's a really fun read and I'd recommend it to everyone.

Linking up here:

Wednesday, April 10, 2013

Sleeve Update 3

The second sleeve to the Fogarty Creek Blazer is coming along slowly. It would probably help if I stop getting distracted by games on my ipod. I love the knit counter app I have, but knitting goes really slowly when I play a level in my game after every round of knitting. I'll also make better progress when I stop focusing on the quilts. My last quilt is scheduled to be finished this weekend (by which it is understood that I'm superwoman and there are 72 sleepless hours in every day.) I have reached the end of the first skein of yarn which means I'm one third of the way through the first sleeve. I love how this sweater is looking so far and can't wait to wear it next winter. Hopefully it will be done by then.


To answer Ginny's other question, I'm currently reading listening to When the Heart Cries. It's another Amish fiction book, but takes a much different approach than many of the other authors I've read. Hannah is unhappy with her life as an Amish woman and is in love with a Mennonite when she's raped by an Englischer. It's the first book in the Sisters of the Quilt trilogy and I can't wait to see how this story unfolds.

Linking up here:


Wednesday, April 3, 2013

Sleeve Update 2

I got distracted by a dish cloth this weekend. (Some how in learning to knit I skipped over the step where you make tons of dish cloths. I made my first three last Christmas and gave all of them to my MIL. I was so excited to use a dish cloth I'd made myself that I forgot to take pictures. I do admit dishes are much more fun now. 

After finishing my dish cloth I was finally able to turn full focus on the second sleeve. I'm about half way through my first of three skeins of yarn and so far everything is going smoothly. I'm still questioning why the designer has the repeats every sixth and thirteenth rows with only half of the chart read after the first repeat, but I'm staying close to my row counter and (knock on wood) I haven't made any mistakes yet. 


Linking up here:

Wednesday, March 27, 2013

One down one to go

I've been focusing on getting quilts done so my knitting has been suffering. I probably should have finished this sleeve a week ago, but progress is still progress. I'm not sure why, but I absolutely hate making sleeves. It was a struggle to force myself to cast on the second sleeve instead of turn to something new. What stopped me is the "new" thing is returning to the purple sweater and doing...the sleeves. Anyway, the second sleeve of the green sweater is on the needles, but since there's only two rows done I'll just share the finished sleeve.


I'm linking up to Ginny's Yarn Along where she asks whats on our needles and what we're reading. I have a long drive to work so I fill that time listening to books on tape. Currently I'm listening to Plain Paradise by Beth Wiseman. It's about a young woman, Lilian, who's mother was Amish, but left for the English world. Lilian and her mother don't have an easy time in the outside world. When Lilian is 27 she escapes a bad relationship and goes to live with her Amish grandparents. She finds the peace she has been missing in the Amish world and the relationship she learns to have with God. 

Linking up here:

Wednesday, March 6, 2013

Sleeve update

My sweater is progressing fairly nicely. I'd guess my sleeve is about two thirds finished. Normally sleeves are my least favorite thing to do, but I've been liking this sleeve so much that I may just do the second sleeve right away. It's lovely to have something green in my life. I thought the world was getting close to going green when we got hit with another line of snowstorms yesterday. I love snow because it teaches us to appreciate the green of spring. I think I've had enough snow to appreciate the green though.


Part of the Yarn Along I'm joining up with asks what I'm reading. I have a 25 minutes drive each way to work so I listen to a lot of books on tape. Currently I'm listening to "The Longing" the third book in the Courtship of Nellie Fisher by Beverly Lewis. I don't like the reader as much as the one who did the first two books, but the story is interesting enough to keep me listening.

Linking up to Ginny.