Tuesday, January 22, 2013
Sock it to Me Week 3
Socks and flu are both progressing slowly. I think I may be making a swing in the direction of health, so if no other bugs decide to attack while my defenses are down I might have real progress on my sock goals soon. Saturday is my quilt guild's winter workshop so unfortunately this week I think that my knitting time will be devoted to cutting fabric for the workshop. Our workshop is focusing on the Drunkard's Path block and I've decided to do a full size quilt for our bed. I'll be sure to take pictures as I go so that in the coming weeks I can do a series of posts on my new quilt. Today I'm pleased to report that the first of my January socks is completed.
Tuesday, January 15, 2013
Sock it to Me week 2
They say it takes at least two weeks to get over the flu. I'm on week three, but a second bug snuck in there when my defenses were low so health my still be a few days away. Knitting has once again been suffering, but I have made it to the toe of the first sock. Hopefully next Tuesday I'll be healthy and have a completed sock to share. (Frankly I'd just be happy with the healthy part though.)
Tuesday, January 8, 2013
Sock it to Me Week 1
I've decided a way to keep myself accountable during my Year of Socks is to add a weekly section showing how much (or little) I've accomplished on my sock. My hope was to have the first of my socks finished by this time, but our house has been hit by a nasty bug that has zapped my husband and I of most of our energy. That said, I did finish the leg of the sock and turned the heel. I'm still working on the gusset, but hopefully by this weekend I'll have finished the rest of it.
My husband has learned to judge my illness level based on how much crafting I'm doing. (He knows things are serious when I'm surrounded by projects and not working on any of them.) I'm been fortunate with this illness that my Falling Stars cardigan has reached the part where I do 13.5 inches of stockinette. When I first saw this I groaned at the thought of that much stockinette, especially since the sweater is knit in the round so there isn't even purls on the back to break up the monotony. When you've got the desire to work, but can't think beyond insert needle, wrap yarn, pull needle back, 13.5 inches of stockinette have become a blessing.
I put the sleeves on waste yarn last Tuesday (the purple marker in the middle shows where the 13.5 inches starts.) It's less than I'd like to have done by now, but it's better than nothing.
Saturday, January 5, 2013
The Last Hobbit Blocks
My Hobbit quilt got set aside a bit as I worked to get everything ready for Christmas. (We're just going to ignore the fact that I had originally intended to have the quilt finished by Christmas.) Here's the last of the Hobbit blocks.
The Arkenstone
Mithril
Smaug
And of course...The Lonely Mountain.
(The picture doesn't do it justice, but this block is twice as a big as the others and will be the center of the quilt.)
Tuesday, January 1, 2013
The Year of Socks
I have decided that this year I want to focus on knitting socks. Of course I'm too scatterbrained to spend an entire year knitting nothing but socks, but I'm hoping to complete at least one or two pairs every month. I've been knitting for two years so socks are still fairly new to me. I'm hoping that by the end of this year my husband and I will have a pair of hand knit socks for every day of the week.
My sister gave me some sock yarn for Christmas and I couldn't resist making them the first pair in
The Year of Socks.
I'm using the "I Love Gansey" pattern from Sock Club. Cables are probably not the best choice for this yarn, but with a high of 4 degrees I couldn't think of doing a sock with lacy holes.
The cables and purled hearts get a bit lost in the self-striping socks, but I rather like the effect they have on the yarn. (Don't you just love those needles too? They were a Christmas gift from my MIL.)
Saturday, December 8, 2012
Christmas Sweater update
I'm starting to wonder if there should be this many bad thoughts knit into a sweater. I thought that I'd finished this sweater in September and all I had left was the seams and finding the perfect buttons. Since I didn't have the perfect buttons, hate seaming, and had a new sweater waiting I put the pieces in the stash and decided to deal with it later. At the beginning of November I was in a knit shop and found the perfect buttons.
Once I got home I put in the shoulder seams for the sweater and started working the button band. I carefully figured out the placement of the buttons and sewed them on. Then I worked the collar and came down the other side and began making holes. Things were working out great until I approached the bottom of the sweater and noticed my sweater looked like this.
Having watched Pooh when I was younger I knew that Piglets sweater unraveled from the bottom in the Blustery Day scene. I also remembered last year the Yarn Harlot made a similar mistake and unraveled the piece from the bottom rather than undoing the button band, collar, shoulder seam, and 10+inches of knitting. I have enough yarn left over and enough time that if I messed up horribly I could just redo it so I poured a drink and unknotted the end. I waited for the whole thing to unravel like Piglet's sweater. It didn't.
There was a ray of hope in a loose yarn tail that I could pull out stitch by stitch. It was very slow going, but was faster than having to reknit the entire piece. After I got past the ribbing the yarn unraveled like a normal piece of knitting does. When I had frogged to the point where the ribbing stopped on the other side I put the stitches back on my needle, knit the ribbing, and cast off.
The way this sweater is going I was terrified that there would be some horrible mistake with the sleeves, but those went in smoothly and the sweater is now finished. After Christmas I'll share pictures of the completed sweater.
(In my research of this technique I learned that the stitches will all be moved half a stitch over so if you're doing something like ribbing you need to undo to the beginning of the ribbing or work a row of decorative stitches to hide the wonkiness.)
Saturday, December 1, 2012
Butterflies and Pinwheels
It's been a while since I've posted an update on my butterfly quilt. I've been working on it steadily for the past three months and have officially reached the middle of the quilt! My guild has a quilt show in the middle of May every year and I'm hoping to have the quilt finished by then. I might just be able to pull it off.
This quilt is a larger one so it's hard to take a good picture of the whole quilt when it's only half finished. I have three rows of pinwheels quilted in the ditch and two and a half rows of white blocks quilted with a teal flower design.
I can't wait for this quilt to be done and hanging on the back of our couch. It's going to be such a wonderful quilt for those chilly spring evenings.
Subscribe to:
Posts (Atom)